Student Success Center
East Field Campus
Dallas College, TX
The Eastfield Campus Student Success Center consists of the construction of a 3-level student center at the existing Eastfield Campus. The construction consists of a pier and beam foundation and associated paving and utilities. The work commenced in February of 2022 and as of February 2023 is ongoing. Alliance Geotechnical Group provided all aspects of testing and inspection on the project including concrete sampling and testing, earthwork inspection and testing, pier inspection, and structural steel.
![Eastfield College 3.png](https://static.wixstatic.com/media/700f34_c3cb25d73348428daef54b8c0c4fd831~mv2.png/v1/fill/w_294,h_294,q_90/700f34_c3cb25d73348428daef54b8c0c4fd831~mv2.png)
![Eastfield College 1.png](https://static.wixstatic.com/media/700f34_e0db1e59662c46dda773c42cc4d3664c~mv2.png/v1/fill/w_295,h_294,q_90/700f34_e0db1e59662c46dda773c42cc4d3664c~mv2.png)
![Eastfield College 2.png](https://static.wixstatic.com/media/700f34_54ea8945c6fa481a9fdd9ac9ad6778db~mv2.png/v1/fill/w_294,h_294,q_90/700f34_54ea8945c6fa481a9fdd9ac9ad6778db~mv2.png)
bottom of page